New
Single Family Dwelling
A plan submittal is usually
not necessary when applying for a permit for the connection of a
new single family dwelling with less than 100 feet of new lateral
sewer line to be installed, unless requested by USD's Engineer.
Upon payment of all fees
and evidence of a city building permit, a sewer permit may be issued
to the party contracted to do the underground construction.
After obtaining a permit,
call 24 hours before beginning sewer construction to schedule an
inspection.
Permit
Application
Lateral
Installation Guide
Permit Fees and
Deposit:
Permit Fee |
$50.00 |
Inspection Fees: |
|
|
$150.00 |
|
$150.00 |
Capacity Fee |
$4,844.73 |
Subtotal |
$5,194.73 |
|
|
Deposit (refundable after acceptance) |
$500.00 |
Total Fees and Deposit |
$5,694.73 |
If a new sewer
lateral needs to be installed, a wye connection at the main may
be neccessary. Wye connections at the main can only be installed
by USD crews, at the property owner/developer's expense.
All contractors wishing
to obtain sewer construction permits for work in the Union Sanitary
District must present evidence of current California Contractors
license, Workers Compensation insurance, and General Liability Insurance
with Union Sanitary District as an additional insured.